Tasks Performed:
- The LAN cable lying below at the empty level was winded up and put near the computer.
- 20 kgs of weight was removed so as to get it closer to our calculations.
- The 3 new recruits also went up the tower and got familiar with the set up.
Observations:
- After removing the weights the time period of the pendulum changed from 2.4 seconds to 2.97 seconds.
- After obtaining some more readings , the circuit stopped working. Possibly a problem with the wiring. A permanent set up for the wires needs to be installed.
- It was also established that the FD2 clock face had a lot of friction and play, and so was responsible for causing the clock to stop and other problems .
Work that needs to be done:
- Ask maintenance guys to clean the pigeon ill-doings.
- Remove wasp webs near the bell chamber.
- Provide with or attach the pipes for the wiring.
- Check laser sensor circuit for errors