LAN repositioned + Weights adjusted

Tasks Performed:

  1. The LAN cable lying below at the empty level was winded up and put near the computer.
  2. 20 kgs of weight was removed so as to get it closer to our calculations.
  3. The 3 new recruits also went up the tower and got familiar with the set up.

Observations:

  1. After removing the weights the time period of the pendulum changed from 2.4 seconds to 2.97 seconds.
  2. After obtaining some more readings , the circuit stopped working. Possibly a problem with the wiring. A permanent set up for the wires needs to be installed.
  3. It was also established that the FD2 clock face had a lot of friction and play, and so was responsible for causing the clock to stop and other problems .

Work that needs to be done:

  1. Ask maintenance guys to clean the pigeon ill-doings.
  2. Remove wasp webs near the bell chamber.
  3. Provide with or attach the pipes for the wiring.
  4. Check laser sensor circuit for errors